TURKIYE SISE CAM A.S.
Kirklareli 1983 2 month
Erection of 800 m3 Spherical tank.
IZOCAM
Gebze 1984 2 month
Rehabilitation of glass melting furnace.
TUGSAS / TEKFEN
Gemlik 1987 88 11 month
Piping, equipment erection, steel cons, insulation of demineralisation and waste water treatment unit.
VAN-LEER MIMAYSAN
Gebze 1991 6 month
Piping desing technological erection of factory.
MANNESMAN ANLAGENBAU
Ankara 1995 - 96 18 month
Production and erection Surface Aerators for waste water treatment plant.
CARNAUD METALBOX
Ýzmit 1996 - 97 10 month
Second Can Line and utilites mechanical and electrical installation.
PREUSSAC NOELL
Ankara 1996 - 97 7 month
Material supply, Piping and equipment erection works of waste water treatment of Ankara. |